MA 2010 Vertical Four-Head Welding Machine
MA 2010 Vertical Four-Head Welding Machine — photo 2
MA 2010 Vertical Four-Head Welding Machine — photo 3
MA 2010 Vertical Four-Head Welding Machine — photo 4
MA 2010 Vertical Four-Head Welding Machine — photo 5
MA 2010 Vertical Four-Head Welding Machine — photo 6
MA 2010 Vertical Four-Head Welding Machine — photo 7
1 / 7
KABAN MA 2010

Vertical Four-Head Welding Machine

Vertical four-head welding machine for serial production of PVC windows.

Price on request Depends on configuration and delivery — we will send a quotation within 30 minutes
Report a problem or suggest an improvement
  • Supplied directly from the KABAN factory, with warranty
  • Commissioning and training at your plant
  • Service and spare parts in Central Asia

Purpose

MA 2010 is a vertical four-head welding machine for serial production of PVC windows. It welds frames and sashes simultaneously and supports white and laminated profiles. It offers adjustable melting and pressure modes, as well as a convenient profile support block (insert) changing system for consistent weld quality and high productivity.

Advantages and equipment

  • Robust mechanical construction suitable for high-speed operation.
  • Welding of white and laminated profiles.
  • Melting and welding times are adjustable depending on the profile type.
  • Practical profile support block (insert) changing system.
  • Pressure control system.

Machine operation videos

Spare parts and documentation

Assembly diagrams 54

Two-head corner welding machine (general view)18 parts Frame and cabinet assembly kit19 parts Movable head main plate kit40 parts Fixed head main plate kit28 parts Single rear hinge assembly Ø324 parts Pneumatic cylinder KSYM-063-0503 parts Movable head kit27 parts Fixed head kit26 parts Movable head rear plate kit18 parts Corner stop kit (right)5 parts Corner stop kit (left)5 parts Fixed head rear plate kit18 parts Movable head upper clamping unit kit42 parts Fixed head upper clamping unit kit42 parts Movable head stop bar kit7 parts Fixed head stop bar kit7 parts Movable head upper clamp and heating element unit kit47 parts Movable head heating element travel unit19 parts Fixed head upper clamp and heating element unit kit47 parts Movable head button panel and guard kit7 parts Movable head push-button panel kit9 parts Fixed head button panel and guard kit6 parts Fixed head push-button panel kit11 parts Movable head electro-pneumatic cabinet kit18 parts Fixed head electro-pneumatic cabinet kit18 parts Head electrical equipment mounting panel kit12 parts MA 2010 electrical cabinet kit26 parts Movable head heating element unit kit24 parts Fixed head heating element unit kit24 parts Cable carrier SC1.1 060 R100 (38 links)3 parts Movable head seal clamp kit45 parts Fixed head seal clamp kit45 parts Seal clamp lever kit (right)5 parts Seal clamp lever kit (left)5 parts Locking pneumatic cylinder kit18 parts Two-head welding machine electrical cabinet kit14 parts Button panel kit7 parts 4+2 valve plate kit13 parts Fixed head heating element travel unit19 parts Electrical cabinet door kit13 parts Frame support kit (left)29 parts Movable head front cover kit11 parts Fixed head front cover kit11 parts Frame support kit (right)8 parts Front profile support kit15 parts Air preparation unit set6 parts 4+2 valve plate kit (without seal clamp)15 parts NYAF wire kit MA 20109 parts Coil and TTR cable kit MA 201015 parts MA 2010 frame kit13 parts Selector valve group kit4 parts Rear plate travel pneumatic cylinder valve kit (fixed head)3 parts Rear plate travel pneumatic cylinder valve kit (movable head)4 parts Seal clamping system (MA 2010)35 parts

FAQ

Is this welding machine suitable for my profile systems?

KABAN welding machines work with most PVC profile systems. At commissioning, we set the temperature, time and pressure parameters for your specific profile and colour (white/laminated).

Can it perform seamless welding and welding for subsequent cleaning?

The specific mode depends on the machine model. Some machines weld for subsequent corner cleaning, others offer seamless welding. We select a solution that meets your requirements for the appearance of the window.

How many operators are needed to run the welding section?

One operator is usually enough for a single machine. When working as part of a line or with several stations, an assistant may be needed to prepare frames and manage the flow.

Similar equipment

Entire section
BA 2030 Single-Head Welding Machine BA 2030
Welding machines

Single-Head Welding Machine

Learn more
MD 3020 Seamless Welding Machine MD 3020
Welding machines

Seamless Welding Machine

Learn more
MG 2010 V-Welding Machine for PVC Profiles MG 2010
Welding machines

V-Welding Machine for PVC Profiles

  • 90° corner welding
Learn more
MH 1010 Single-Head Welding Machine MH 1010
Welding machines

Single-Head Welding Machine

Learn more
MK 2010 Four-Head Welding Machine MK 2010
Welding machines

Four-Head Welding Machine

  • 17-inch touchscreen
Learn more
MK 2020 Four-Head Welding Machine MK 2020
Welding machines

Four-Head Welding Machine

  • 7-inch touchscreen
Learn more
MV 1010 Vertical Four-Head Welding Machine MV 1010
Welding machines

Vertical Four-Head Welding Machine

  • 7-inch touchscreen
Learn more
MV 1020 Vertical Four-Head Welding Machine MV 1020
Welding machines

Vertical Four-Head Welding Machine

  • 7-inch touchscreen
Learn more

Turnkey plant launch with the MA 2010

We will select the entire line: cutting, machining, welding, cleaning, assembly — and launch production.

CallWhatsAppTelegram