MK 2010 Four-Head Welding Machine
MK 2010 Four-head welding machine — photo 2
MK 2010 Four-head welding machine — photo 3
MK 2010 Four-head welding machine — photo 4
1 / 4
KABAN MK 2010

Four-Head Welding Machine

Four-head welding machine for PVC frames and sashes, delivering high geometric accuracy and consistent weld quality.

  • 17-inch touchscreen
Price on request Depends on configuration and delivery — we will send a quotation within 30 minutes
Report a problem or suggest an improvement
  • Supplied directly from the KABAN factory, with warranty
  • Commissioning and training at your plant
  • Service and spare parts in Central Asia

Purpose

MK 2010 is a four-head welding machine for PVC frames and sashes, delivering high geometric accuracy and consistent weld quality. It supports white and laminated profiles and is equipped with a Mitsubishi PLC, a 17" touchscreen, automatic lubrication and remote support. Suitable for serial and high-capacity window production.

Technical specifications

Heads4
Screen17″ touchscreen
Control systemPLC Mitsubishi

Advantages and equipment

  • Robust mechanical construction suitable for high-speed operation.
  • Welding of white and laminated profiles.
  • Mitsubishi PLC control system.
  • 17-inch touchscreen.
  • User-friendly Kaban interface with an easily configurable parametric structure.
  • Software that enables order-based production.
  • Heating is controlled by a PID system depending on the profile type.
  • Melting and welding times are adjustable depending on the profile type.
  • Barcode scanner support.
  • Service support via remote connection.
  • Automatic lubrication system.

Machine operation videos

Spare parts and documentation

Assembly diagrams 46

MK 2010 Welding - Four-corner welding machine (general view)13 parts X-axis belt pulley shaft support package9 parts Aluminium conveyor package - right31 parts Aluminium conveyor package - left31 parts Y-axis group pre-assembly package14 parts Upper clamp and lift group package - 136 parts Corner stop package - right7 parts Corner stop package - left7 parts Lower table and upper clamp package - 215 parts Upper clamp package - 118 parts Main lower table package for heads 1 and 431 parts Upper clamp package - 218 parts Lower table and upper clamp package - 315 parts Main lower table package for head 346 parts Lower table and upper clamp package - 2 (head 3)14 parts Upper clamp and lift group package - 237 parts Stop bar pneumatic cylinder package Ø32-507 parts Head 3 package28 parts Head 4 package25 parts Y2-axis frame package68 parts Y-axis belt pulley group package - tensioner side6 parts Y2-axis servo motor group package18 parts Y2-axis group pre-assembly package14 parts X-axis main frame package50 parts X-axis belt pulley shaft gearbox mounting package24 parts Cable chain (CEA SC2 B100, inner size 35x100)3 parts Cable chain (CEA SC1.1 B060, inner size 32x60)3 parts Y1-axis frame group package47 parts Electrical cabinet package15 parts Four-corner welding electrical panel package50 parts Four-corner welding electrical cabinet cover package10 parts Welding heads electrical panel package13 parts Head 3 electrical cabinet pre-assembly package28 parts Heating element group package20 parts 12-station valve plate (valve manifold) package14 parts Four-corner welding 7-inch screen and buttons package12 parts Pneumatic cylinder Ø63*25 package with fittings4 parts Pneumatic cylinder Ø32*25 package with fittings2 parts Upper clamp pneumatic cylinder package3 parts Pneumatic cylinder Ø32*230 package with fittings4 parts MK 2010 TTR cables and coiled cords package22 parts MK 2010 NYAF wires package11 parts MK 2010 pneumatic hoses package7 parts Lubrication package (MK 2010)5 parts Pneumatic group package18 parts Computer cabinet (control terminal) package14 parts

FAQ

Is this welding machine suitable for my profile systems?

KABAN welding machines work with most PVC profile systems. At commissioning, we set the temperature, time and pressure parameters for your specific profile and colour (white/laminated).

Can it perform seamless welding and welding for subsequent cleaning?

The specific mode depends on the machine model. Some machines weld for subsequent corner cleaning, others offer seamless welding. We select a solution that meets your requirements for the appearance of the window.

How many operators are needed to run the welding section?

One operator is usually enough for a single machine. When working as part of a line or with several stations, an assistant may be needed to prepare frames and manage the flow.

Similar equipment

Entire section
BA 2030 Single-Head Welding Machine BA 2030
Welding machines

Single-Head Welding Machine

Learn more
MA 2010 Vertical Four-Head Welding Machine MA 2010
Welding machines

Vertical Four-Head Welding Machine

Learn more
MD 3020 Seamless Welding Machine MD 3020
Welding machines

Seamless Welding Machine

Learn more
MG 2010 V-Welding Machine for PVC Profiles MG 2010
Welding machines

V-Welding Machine for PVC Profiles

  • 90° corner welding
Learn more
MH 1010 Single-Head Welding Machine MH 1010
Welding machines

Single-Head Welding Machine

Learn more
MK 2020 Four-Head Welding Machine MK 2020
Welding machines

Four-Head Welding Machine

  • 7-inch touchscreen
Learn more
MV 1010 Vertical Four-Head Welding Machine MV 1010
Welding machines

Vertical Four-Head Welding Machine

  • 7-inch touchscreen
Learn more
MV 1020 Vertical Four-Head Welding Machine MV 1020
Welding machines

Vertical Four-Head Welding Machine

  • 7-inch touchscreen
Learn more

Turnkey factory launch with the MK 2010

We will select the entire line: cutting, machining, welding, cleaning, assembly — and launch production.

CallWhatsAppTelegram